How Long Does a Bathroom Remodel Take in Prescott, AZ?

Written by Crosby Home Services | Mar. 17, 2025

A bathroom remodel can completely transform the look and functionality of your space, making it more modern, efficient, and luxurious. A question that often comes up for homeowners before jumping into a renovation is: How long does a bathroom remodel take?

The timeline for a bathroom remodel isn’t one-size-fits-all—it depends on the project’s complexity, material availability, and your contractor’s schedule. If you’re considering a bathroom remodel in Prescott, AZ, this guide breaks down what to expect, from planning to completion, along with key factors that can influence the process and budget.

 

The Average Time to Remodel a Bathroom

The average time to remodel a bathroom can take anywhere from three to eight weeks, depending on the bathroom’s size, the project’s complexity, and any unforeseen setbacks. Here’s a closer look at the typical bathroom remodeling timeline:

1. Planning and Design (1-3 Weeks)

Before any work begins, you’ll work with your contractor to finalize the design, select materials, and secure necessary permits. Taking the time to plan properly can help prevent delays once construction starts. 

This phase also includes setting a budget, discussing your vision, and ensuring that all selections are available and ready for installation. A well-thought-out plan reduces the chances of mid-project changes that could extend the timeline.

2. Demolition (2-4 Days)

Out with the old! This phase involves removing outdated fixtures, tiles, and sometimes even walls to clear the space for your new design. Depending on the complexity of the project, demolition may involve additional structural modifications, such as expanding a shower area or reconfiguring the layout. 

3. Plumbing and Electrical Work (1-2 Weeks)

If your remodel includes relocating a shower, sink, or toilet, plumbers and electricians will need to reroute pipes and wiring. This stage may take longer if your home has older systems that need upgrading. Ensuring everything is up to current building codes is essential for safety and long-term reliability.

4. Structural Work and Drywall (1-2 Weeks)

New walls are framed, floors are reinforced, and any necessary adjustments are made to accommodate your updated layout. Once the framing is complete, drywall is installed and prepped for finishing. 

If you’re adding built-in shelving, a larger vanity, or other custom elements, this is when those modifications take shape. After installation, the drywall is taped, mudded, and sanded to create a smooth, paint-ready surface.

5. Flooring, Tile, and Painting (1-2 Weeks)

Custom tilework can be one of the more time-consuming steps, especially for intricate designs. Larger tiles may go in faster, while small, detailed patterns take more precision and time. Once the tiling is complete, the walls get a fresh coat of paint to bring the space to life. 

6. Fixture Installation (1-2 Weeks)

Your new sinks, toilets, showers, tubs, and lighting fixtures are installed, transforming your space from a construction zone into a functional bathroom. During this phase, final plumbing and electrical connections are made to ensure everything works properly. Smart features, such as touchless faucets or heated flooring, are also installed at this time.

7. Final Touches and Inspection (1 Week)

Your contractor will conduct a final walkthrough, making any last adjustments and ensuring everything meets code. Any minor touch-ups, such as caulking, hardware installation, or final cleaning, are completed. Once approved, your brand-new bathroom is ready for use!

 

Factors That Affect the Bathroom Remodel Timeline 

While most bathroom remodels take between three and eight weeks, certain factors can extend the timeframe. Here’s what might slow things down:

  • Custom Features – Made-to-order vanities, specialty tiles, and high-end fixtures add a unique touch but often require longer lead times for manufacturing and delivery.
  • Permit Processing – Prescott, AZ has specific building codes and permit requirements, and approvals can sometimes take longer than expected.
  • Material Availability – If your design includes imported materials or back-ordered products, delays in shipping could put your project on hold.
  • Unexpected Structural Issues – Older homes may reveal surprises like outdated plumbing, hidden water damage, or faulty wiring, all of which need to be addressed before moving forward.

Working with an experienced contractor can help anticipate these challenges and keep your project on track.

 

Small vs. Large Renovation Timelines

The time it takes to complete a bathroom remodel in Prescott, AZ really comes down to how much work needs to be done. Here’s a breakdown of what to expect for different types of remodels:

Small Bathroom Remodel (3-4 Weeks)

A cosmetic refresh that includes new tile, a fresh coat of paint, and swapping out key fixtures like the vanity, toilet, or lighting. Since this type of renovation doesn’t usually require major plumbing or electrical work, it can be completed relatively quickly.

Mid-Range Bathroom Remodel (4-6 Weeks)

If you’re looking to replace multiple fixtures, install new flooring, or make moderate plumbing or electrical upgrades, expect a longer timeline. This level of renovation may also involve reconfiguring the layout, which adds extra steps to the process.

Luxury or Full-Scale Remodel (6-8+ Weeks)

A complete overhaul with custom cabinetry, high-end materials, expanded layouts, or smart home features will take the longest. These projects often require structural modifications, extensive plumbing and electrical updates, and specialty finishes that may have longer lead times.

Tips for a Smooth Kitchen Remodel

No one wants their bathroom out of commission for longer than necessary. While some delays are unavoidable, there are a few ways to help keep your bathroom remodel timeline on track and running smoothly. Here’s what you can do:

1. Make Decisions Early

Choosing materials, fixtures, and finishes before the project starts can save weeks of waiting on backorders or last-minute changes. A clear plan helps contractors work more efficiently and prevents the frustration of scrambling for alternatives when a product is unavailable. If you’re working with a designer, finalize selections together so everything aligns with your vision before construction begins.

2. Hire the Right Professionals

An experienced contractor in Arizona will coordinate the project, schedule subcontractors, and handle any surprises along the way.

Working with a reliable team means fewer delays and better results. Look for professionals with strong local references, a solid portfolio, and knowledge of bathroom remodeling in Prescott, AZ to ensure they understand the region’s permitting process and common renovation challenges.

3. Expect the Unexpected 

Remodeling can uncover hidden plumbing issues, outdated wiring, or other surprises behind the walls. Building in some buffer time (and budget) for these possibilities will help reduce stress if delays arise. A good contractor will keep you informed about potential risks from the start, but flexibility and patience can make all the difference when unexpected setbacks occur.

4. Get Permits in Advance

In Prescott, AZ, certain renovations require permits, which can take time to process. Your contractor should know what’s needed, but applying early ensures your project isn’t held up by paperwork. Delays in approval can push back the entire remodel, so getting this step out of the way as soon as possible will help you stay on schedule.

5. Be Available for Quick Decisions

Questions will come up during the remodel, whether it’s about tile patterns, fixture placement, or unforeseen issues. Responding quickly to your contractor’s requests can prevent work from coming to a standstill. Even small delays in decision-making can add extra days or even weeks to the project. Keeping open lines of communication and checking in regularly will help everything run smoothly.

By planning ahead and staying flexible, you can help ensure your bathroom remodel in Prescott, AZ stays on schedule and runs as smoothly as possible.

 

Quality Bathroom Remodeling You Can Trust

So, how long does a bathroom remodel take? The truth is, it depends on the details—small upgrades can take just a few weeks, while a full transformation might take a couple of months. But no matter the scope, the right team makes all the difference in keeping things on schedule and as stress-free as possible.

Whether you’re planning a shower remodel in Prescott, AZ, a complete bathroom remodel in the Quad Cities, or a luxury upgrade in Sedona, Crosby Home Services is here to help you get there efficiently. 